Data lives everywhere except where you need it.
Every ESOS engagement started the same way: sub-meter data in one system, half-hourly in another, invoices in a third. Consolidation isn't a nice-to-have, it's the audit.
Twelve months in, KEES has grown from a founder-led consultancy into a trusted delivery partner across UK private and public sectors — from ESOS Phase 4 audits at manufacturing sites to embedded engineering placements in local government, and shaping a city-wide reuse standard alongside the City of London Corporation.
KEES's first full year focused on the same problem across very different clients: energy and carbon obligations are rarely the real bottleneck. The real bottleneck is fragmented data, thin internal capacity, and reporting cycles that don't line up. Our job in 2025 was to close those gaps with tools clients can keep using long after the engagement ends.
On the private side, that meant lead-assessor-led ESOS Phase 4 audits, energy and carbon management tools that consolidate SECR, ESOS and CRP into a single source of truth, and third-party-verified EPDs delivered on tight product-launch timelines. On the public side, embedded engineering placements gave local authority FM teams the ability to model, prioritise and secure funding for site-level improvements themselves, with KEES stepping back once the capability was in place.
Underpinning all of it: workshops. Ten Energy Management Awareness sessions across the year brought 75+ energy professionals through practical, live-example teaching on ISO 50001, ESOS and MEES readiness. The market signal was consistent. Teams want the how, not more of the what.
Patterns that repeated across manufacturing, plant hire, performing-arts campuses and product manufacturers.
Every ESOS engagement started the same way: sub-meter data in one system, half-hourly in another, invoices in a third. Consolidation isn't a nice-to-have, it's the audit.
KAB Seating went from introduction to full ESOS compliance in seven weeks. That's only possible when the site data is triaged before the site visit, not during.
Flannery Plant Hire replaced fragmented ESOS / SECR / CRP reporting with a single Energy & Carbon Management Tool feeding all three from actual operational data, removing the annual scramble.
Five third-party-verified EPDs for EPAS in under six months, component-by-component in OneClick LCA, no shortcut groupings. Fast is not the enemy of rigorous.
Italia Conti's Woking district heating tangle resolved once four parties worked from one KEES-owned tracker. 15% cost savings followed the shared visibility, not the technical fix.
Clients pursuing 50001 for ESOS coverage found the operational discipline paid back in day-to-day energy management, a stronger argument than compliance alone.
Two public-sector engagements in 2025 went beyond a single-site audit, each left behind a tool or standard the client owns.
A 12-week embedded engineering placement, eight sites baselined, the FM team upskilled, £820k funding secured, and a portfolio-wide 33% energy reduction modelled and ready for delivery.
Read the Lewes case study →KEES developed the pre-deconstruction audit templates now formally adopted in the City's Supplementary Planning Document, required at RIBA Stage 2 or earlier, built on a 9-level material reuse hierarchy.
Read the City of London case study →Ten Energy Management Awareness workshops across 2025 introduced 75+ professionals to KEES's practical delivery approach, several converting into scoped engagements.
Public sector engagements used UKRI-aligned baseline and monitoring frameworks so that outputs remain fundable and comparable across authorities.
Every ESOS and SECR engagement left the client with a live, editable data register, so the next reporting cycle starts from a maintained baseline rather than a rebuild.
Active membership in professional bodies (IEMA, EMA, SocEnv) means KEES delivery is checked against evolving best practice, not the standards of 12 months ago.
CEnv — Chartered Environmentalist
Chartered status through SocEnv, denoting proven professional practice in environmental management and sustained CPD.
ISO 50001 Lead Auditor
Qualified to design, implement and audit energy management systems to the international standard, including ESOS Route 3 coverage.
EA-Registered ESOS Lead Assessor
Environment Agency registered Lead Assessor for ESOS Phase 3 & Phase 4, including the 2026 Amendment Regulations.
One tool, three deadlines, replacing fragmented compliance reporting at Europe's largest plant hire firm.
Read case study →33% portfolio reduction modelled via a 12-week embedded placement and £820k in funding secured.
Read case study →A city-wide pre-deconstruction audit standard adopted into the Supplementary Planning Document.
Read case study →ESOS Phase 4 audit, SECR readiness, EPD delivery or an embedded engineer placement. Start with a short call.
We use analytics cookies to understand how visitors use our site so we can improve it. No personal data is sold or shared with third parties beyond Google Analytics. See our Cookie Policy.