Case studies

Real work, real numbers, real partnerships.

KEES isn't a paper exercise — we get into the data, walk the site, and stay through implementation. Below are the projects we're proud of, with the savings clients are now realising and the words they used to describe the work.

5 / 5 projectsSorted: Most recent
01 · Manufacturing · NorthamptonESOS Phase 3 Compliance

From “in a pickle” to fully compliant in seven weeks.

KAB Seating's 228,517 sq ft Northampton facility had two weeks until site visit and a hard ESOS deadline looming. Half-hour electrical data, a maintenance-week site visit, and a tight focus on practical findings — 25% of total energy spend identified, action plan delivered, compliance achieved.

12.3%Cost / yr saving
498kkWh / yr saving
107tCO₂e / yr
Energy demand · 14–20 Jul 2025
498kkWh annual
saving identified
MonTueWedThuFriSatSun
02 · Construction · Wembley & UKESOS · SECR · CRP

One tool, three deadlines, zero estimates.

Europe's largest plant hire firm — 12 sites, 230 light vehicles, 45 HGVs. Replaced fragmented reports with a single Energy & Carbon Management Tool feeding ESOS, SECR and CRP from one source of actual data.

8.7%Cost / yr saving
1.88mkWh / yr saving
523tCO₂e / yr
03 · Education / Performing arts · WokingDistrict Heating & Cooling

Untangling a district energy contract — and the costs.

A Grade-A 48,000 sqft performing arts campus tied into Thameswey's district system, with mismatched primary/secondary capacities and unoptimised controls. KEES brought every stakeholder to one tracker, and one set of solutions.

15%Cost / yr saving
68.4kkWh / yr saving
5.4tCO₂e / yr
04 · Commercial kitchens · ManchesterVerified EPDs · OneClick LCA

Five verified EPDs, under six months.

GreaseShield and FilterShield products — ~150 components per unit, complex in-use stages — taken from bill-of-materials to verified Environmental Product Declarations. Component-by-component LCA, no shortcut groupings.

5Verified EPDs
150Components / LCA
<6moFrom kickoff
05 · Local government · Lewes & coastEmbedded Engineer · 8 sites

A 33% reduction across the council's portfolio.

A 12-week embedded placement covering leisure centres, swimming pools and a Grade II-listed Marine Workshop. Baseline established, FM team upskilled, funding secured — extended to deliver implementation.

33%Energy reduction
8Council sites
12wkInitial placement
Get started

Got a deadline, a complex site, or a number you can't trust?

Most of these case studies started with one phone call. Tell us what's on your plate — we'll be honest about whether KEES is the right fit, and what the next 30 days could look like.