KEES isn't a paper exercise — we get into the data, walk the site, and stay through implementation. Below are the projects we're proud of, with the savings clients are now realising and the words they used to describe the work.
KAB Seating's 228,517 sq ft Northampton facility had two weeks until site visit and a hard ESOS deadline looming. Half-hour electrical data, a maintenance-week site visit, and a tight focus on practical findings — 25% of total energy spend identified, action plan delivered, compliance achieved.
Europe's largest plant hire firm — 12 sites, 230 light vehicles, 45 HGVs. Replaced fragmented reports with a single Energy & Carbon Management Tool feeding ESOS, SECR and CRP from one source of actual data.
A Grade-A 48,000 sqft performing arts campus tied into Thameswey's district system, with mismatched primary/secondary capacities and unoptimised controls. KEES brought every stakeholder to one tracker, and one set of solutions.
GreaseShield and FilterShield products — ~150 components per unit, complex in-use stages — taken from bill-of-materials to verified Environmental Product Declarations. Component-by-component LCA, no shortcut groupings.
A 12-week embedded placement covering leisure centres, swimming pools and a Grade II-listed Marine Workshop. Baseline established, FM team upskilled, funding secured — extended to deliver implementation.
Most of these case studies started with one phone call. Tell us what's on your plate — we'll be honest about whether KEES is the right fit, and what the next 30 days could look like.